Building
780 CMR – Massachusetts State Building Code, 10th Ed.
Based on 2021 IBCEffective Oct 11, 2024Tracker
Mandatory after the concurrency period ended in 2025.
Massachusetts (statewide)
Mandatory after the concurrency period ended in 2025.
Most municipalities have adopted the Stretch Code; some (e.g. Boston) the Specialized Opt-in Code.
First state on the 2026 NEC.
This city writes its own codes or substantially amends the state code.
Boston opted in to the stricter specialized code; building code itself is the statewide 780 CMR.