National Building Code of Canada
Canada's model building code, and the base of every provincial code.
What it covers
The NBC covers new buildings, from houses to high-rises, plus demolition and change of use. It is a model code: it has force only where a province or territory adopts it. British Columbia, Alberta, Ontario and Quebec publish their own versions based on it.
It is objective-based. Division A says what the code is trying to achieve and how to comply. Division B holds the technical requirements, called acceptable solutions. Division C covers administration. If you can show an alternative meets the same objectives, the authority having jurisdiction can accept it.
Read the official text
Opens the publisher's or government's own copy in a new tab.
How it is organized
- Div. ACompliance and objectivesApplication, how to tell whether a building falls under Part 3 or Part 9, and the objectives and functional statements behind each requirement.
- Div. B, Part 3Fire protection, occupant safety and accessibilityFor larger buildings: occupancy classification, building size and construction, fire separations, exits, washrooms and barrier-free design.
- Div. B, Part 4Structural designLoads from snow, wind, rain and earthquakes, and design of structural members.
- Div. B, Part 5Environmental separationControlling heat, air, moisture and rain through the envelope of larger buildings.
- Div. B, Part 6Heating, ventilating and air-conditioningHVAC design and installation for larger buildings.
- Div. B, Part 7Plumbing servicesPoints to the National Plumbing Code.
- Div. B, Part 8Construction and demolition sitesProtecting the public and workers during construction.
- Div. B, Part 9Housing and small buildingsThe prescriptive part used for houses and small buildings: stairs and guards, egress, fire protection, foundations, wood framing, insulation and air barriers, ventilation and energy efficiency (9.36).
- Appendix CClimatic and seismic dataDesign snow, wind, temperature and seismic values for hundreds of Canadian locations.
Common answers
Where to look in the official text.
| Is my building a Part 9 or a Part 3 building? | Division A, Article 1.3.3 (generally up to 3 storeys and 600 m² footprint for Part 9) |
| Major occupancy classification | Division B, Article 3.1.2.1 |
| Stairs, handrails and guards in a house | Division B, Section 9.8 |
| Bedroom egress window | Division B, Article 9.9.10.1 |
| Smoke alarms | Division B, Subsection 9.10.19 |
| Carbon monoxide alarms | Division B, Article 9.32.3.9 |
| Joist and rafter spans | Division B, Section 9.23 and its span tables |
| Insulation and energy performance for houses | Division B, Section 9.36 |
| Snow and wind loads for my town | Division B, Appendix C, Table C-2 |
| How many washrooms a larger building needs | Division B, Subsection 3.7.2 |
References are to NBC 2020; provincial versions may number some items differently.
How editions differ
- NBC 2025Raises the height limit for encapsulated mass timber to 50 m (still 12 storeys), adds operational greenhouse-gas requirements and new compliance options to 9.36, uses projected future climate data, adds a passive radon stack, and introduces Part 10 for alterations to existing buildings. Newfoundland and Labrador adopted it in July 2026.
- NBC 2020Adds tiered energy performance levels for houses (9.36) and larger buildings, encapsulated mass timber up to 12 storeys, and accessibility updates. In force in most provinces and territories.
- NBC 2015Still in force in Nunavut.
- Provincial versionsOntario's code adds parts for change of use (Part 10), renovation (Part 11) and resource conservation (Part 12). BC's adds the Energy Step Code and Zero Carbon Step Code. Vancouver writes its own by-law based on BC's code.
Where it is in force
Locations on this site that use this code, by edition.
This guide is an original plain-language summary, not the code itself. Section numbers can shift between editions and local amendments, so always confirm against the official text adopted where you build.